| 2026-11-03 | 3100 AVENUE A, WHITE CITY, OR 97503 | TENANT IMPROVEMENT AND CHANGE OF USE FOR AN EXISTING BUILDING FROM AN ASSISTED LIVING FACILITY TO AN ANOREXIA AND BULIMIA RECOVERY CENTER. THE INTERIOR REMODEL SHALL CONSIST OF SOME MINOR PARTITION REMOVAL; THE REPLACEME | $52,000 | — |
| 2026-11-02 | 8048 BRIE TER, WHITE CITY, OR 97503 | 6.45kW PV PRESCRIPTIVE ROOF MOUNTED Solar Panel Installation on Roof - 15 panels ON EXISTING DWELLING (439-1999-1598-R3) | $500 | — |
| 2026-11-02 | 8048 BRIE TER, WHITE CITY, OR 97503 | 6.45kW PV Solar Panel Installation on Roof - 15 panels // 439-26-003463-STR | $11,610 | — |
| 2026-11-02 | 1090 DUNLAP RD, JACKSONVILLE, OR 97530 | FLOODPLAIN*** Install 2.64 KW PRESCRIPTIVE ROOF MOUNTED Solar Array ON METAL BARN (439-25-003365-STR) | $500 | — |
| 2026-10-29 | 2395 SUNSET CT, MEDFORD, OR 97501 | 11.18 DC/9.98 AC kW residential PRESCRIPTIVE ROOF MOUNTED solar system to be installed on roof. Main Panel Upgrade to 225A Main panel with 200A Main Breaker. OF EXISTING DWELLING | $500 | — |
| 2026-10-29 | 2395 SUNSET CT, MEDFORD, OR 97501 | 11.18 DC/9.98 AC kW residential PRESCRIPTIVE ROOF MOUNTED solar system to be installed on roof. Main Panel Upgrade to 225A Main Panel with 200A Main Breaker ON EXISTING DWELLING (439-26-003433-STR) | $20,124 | — |
| 2026-10-22 | 195 GIBBON RD, CENTRAL POINT, OR 97502 | 12.90 kW DC / 11.52 kW AC residential solar system to be installed on roof , MPU being installed - new 225 A Main Service Panel upgrade | $500 | — |